Here are selected current and upcoming transportation projects and road closures in Coweta County. All efforts are made to ensure that this list is as up to date as possible. If you want more information on future transportation projects, click here.    

 

Project Updates

Project Name/Type Status

Chattahoochee Hill Country Regional Greenway Trail

Downloads:

Currently under design.
Madras Connector Phase 1   Environmental and engineering 2017-2018, ROW acquisition 2019, construction 2020
SR16/SR54 Roundabout   2018
Five Points - Round-a-bout   COMPLETE

I-85 @ Poplar Road

 

Construction 2016-2019
See the layout

Pine Rd. @ US29 @ SR16 Intersection Improvements  

COMPLETE

Newnan Bypass East   COMPLETE
Lora Smith Road @ SR34 Right Turn Lane/Signal   COMPLETE
Lora Smith Road @ Lower Fayetteville Road - Intersection Improvements/Signal   COMPLETE
Corinth/Belk/Smokey Roads - Intersection Improvements   Construction 2017
Couch Road - Paving   Construction 2017 
Howard Road Realignment & Rehabilitation   COMPLETE

 

FULL DEPTH RECLAMATION (FDR)

A pavement rehabilitation technique in which the full flexible pavement section and a predetermined portion of the underlying materials are uniformly crushed, pulverized or blended, resulting in a stabilized base course; further stabilization may be obtained through the use of available additives.

Road Name

From

To

Mile(s)

Goodwyn Road

Norfolk Southern RR

Poplar Road

1.210

Ravmond Shedden Ave

SR16

Norfolk Southern RR

0.320

Linch Road

Hall Road

Turin Town Limits

1.360

Thomas Powers Road

SR34

Handy Road

2.710

Hudgens Road

Fischer Spur

Palmetto- Tyrone Rd

0.500

E Murphy Street

E Newnan Road

E Second Street

0.422

E Second Street

E Murphy Street

E Hill Street

0.114

E Hill Street

E Murphy Street

Dead End

0.238

E Field Street

E Murphy Street

E Second Street

0.160

Posey Road

Baker Rd

1300' N of Baker

0.246

North Road (Turin)

Odom Rd

Turin Town Limits

0.315

Widewater Drive

Baker Road

Cul-de-sac

0.772

Thorntons Gap Dr

Widewater Drive

Cul-de-sac

0.126

Williamsport Dr

Thorntons Gap

Cul-de-sac

0.134

Seven Pines Dr

Widewater Drive

Cul-de-sac

0.083

Cobbler Drive

Bagley Road

Brenda Ellen Drive

0.344

Brenda Ellen Drive

Cranford Mill Drive

Cul-de-sac

0.432

Mill Wheel Court

Brenda Ellen Drive

Cul-de-sac

0.069

Ellen Court

Brenda Ellen Drive

Cul-de-sac

0.066

Windsong Drive

Forest Circle

Silverwood Drive

0.127

Mistletoe Lane

Windsong Drive

Cul-de-sac

0.089

Silverwood Drive

Brookfield Drive

Cul-de-sac

0.121

Brookfield Drive

Forest Circle

Cul-de-sac

0.1471

Manchester Drive

Hwy 154

Culdesac

0.4621

Middlebury Lane

Manchester Dr

Culdesac

0.3661

Barrington Farms Pkwy

Andrew Bailey Road

Barrington Grange Ct

0.7501

Fieldstone Way

Morning Dove Lane

Newnan City Limits

0.518

Pheasant Ridge

Fieldstone Way

Newnan City Limits

0.171

Fieldstone Lane

Sullivan Road

Fieldstone Way

0.064

Stone Mill Court

Fieldstone Way

Cul-de-sac

0.083

Fieldstone Court

Fieldstone Way

Cul-de-sac

0.035

Morning Dove Lane

Cul-de-sac

Cul-de-sac

0.163

Morning Dove Court

Morning Dove lane

Cul-de-sac

0.041

Longwood Lane

Roscoe Road

Cul-de-sac

0.710

Willow Lake Lane

0.076

 TOTAL MILES      13.544

CRACK RELIEF

Resurfaces existing pavement structures from water damage and delays reflective cracking in new surfaces therefore extending the life of the roadway.
 
 CRACK RELIEF INTERLAYER (CRIL) CONSTRUCTION
       
 Road Name  From  To  Mile(s)
 Bethlehem Church Road West Grantville Road   Pavement Junction/Allen Road  2.470
 Glazier Road  Al Roberts Road  Gordon Road 1.373
 Howard Hughes Road Old Atlanta Hwy   Country Club Road 1.329 
 Linch Road Johnson Road  Hall Road  0.927
 TOTAL MILES      6.099
 
DOUBLE SURFACE TREATMENT

Pavement surfacing construction involving two applications of asphalt binder material and mineral aggregate. The emulsion is applied by a pressure distributor, followed immediately by an application of mineral aggregate, and finished by rolling. The result is an improved roadway at a lesser cost allowing more roads to be rehabilitated with available funds.
 
 DOUBLE SURFACE TREATMENT CONSTRUCTION
       
 Road Name  From  To  Mile(s)
 Bo Bo Banks Road  Grantville City Limits  Allen Road  2.229
 Oliver Potts Road  Adcock Road  Oliver Potts Road  0.944
 TOTAL MILES      3.173

 

Please note, all transportation projects underway in the county are not handled by the county.  For more information on State Projects, click here.  If you select "Search by Region," Coweta County is in the West Region. 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer